Piston banding automation

Khandsa · Automation
0%
Overall Completion
Project Details
Machine Number
-
Customer
-
IO Number
-
Design Lead
-
Designer
-
Supplier
GTRP
Cost (MINR)
6.7
Target
Feb 27'
Current Status
-
Stage Completion
Stage A 0%
Stage B 0%
Stage C 0%
Stage D 0%
Stage E 0%
Stage F 0%

Milestones
Std Release Std Ordered Mfg Release Mfg Ordered Inspection Assembly Internal Trial Despatch Commissioning Manuals
Materials Summary · Manufacturing & Boughtouts As of 02-11-2026

No BOM uploaded yet - upload the Standard BOM to see the materials summary.

By Type

No BOM cost recorded yet.

Budget vs Actual Cost (MINR) vs live BOM cost

Needs both a Cost (MINR) budget and a BOM upload to compare.

Process Flow Checklist
Export to Excel

Task Description Status Planned Start Planned End Actual Start Actual End Remarks
A1 Capex transfer from plant NotStarted - - - - -
A2 IO number/CWIP Asset code generation NotStarted - - - - -
A3 Project kick-off meeting from Design lead NotStarted - - - - -
A4 Design review for cost reduction NotStarted - - - - -
A5 Design review for project lead time reduction NotStarted - - - - -
A6 Design review for routing & planning NotStarted - - - - -
A7 Design review for alignment mandril NotStarted - - - - -
A8 Test chart discussion with Design lead NotStarted - - - - -
A9 Receiving of standard BOM &Circuits NotStarted - - - - -
A10 Receiving of manufacturing parts &pheriperals NotStarted - - - - -
A11 Receiving of fasteners list NotStarted - - - - -
A12 Receiving of sub assembly drawings ,test chart NotStarted - - - - -
A13 Receiving of Customer documents(DAP,DAP-MOM,Customer checksheet,process parameters) NotStarted - - - - -
A14 Electrical Design Review/ Part list preparation NotStarted - - - - -
A15 Electrical BOM Preparation NotStarted - - - - -

Task Description Status Planned Start Planned End Actual Start Actual End Remarks
B1 RFQ to suppliers /Vendor selection NotStarted - - - - -
B2 Categorization of parts in to 3 segments ( critical ,medium , normal type) NotStarted - - - - -
B3 Cost comparison/optimization /cost reduction data submission to CFT NotStarted - - - - -
B4 Electrical items RFQ/ Quotation /Negotiation NotStarted - - - - -
B5 Critical parts ordering NotStarted - - - - -
B6 Release of control panel NotStarted - - - - -
B7 Medium &Normal category ordering NotStarted - - - - -
B8 Electrical items (field materials) PO release NotStarted - - - - -
B9 PO release to suppliers and confirmation /PO approvals NotStarted - - - - -
B10 Cash purchase items procurement NotStarted - - - - -
B11 Panel inspection & validation NotStarted - - - - -
B12 Parts receipt (Critical parts) & Storage in pallets and racks with identification tag NotStarted - - - - -
B13 Parts receipt (M&Nornal parts) & Storage in pallets and racks with identification tag NotStarted - - - - -
B14 STD parts procurement & material receipt NotStarted - - - - -
B15 Receipt of control panel and field materials NotStarted - - - - -

Task Description Status Planned Start Planned End Actual Start Actual End Remarks
C1 Trails parts requirment list receipt from design lead NotStarted - - - - -
C2 Follwup with Customer plant for trail parts NotStarted - - - - -
C3 STO preparation and communication to customer NotStarted - - - - -
C4 Receipt of trail parts at shop floor NotStarted - - - - -

Task Description Status Planned Start Planned End Actual Start Actual End Remarks
D1 Study all the drawings for assembly NotStarted - - - - -
D2 Full kit assembly preparation based on BOM and Assembly dwgs NotStarted - - - - -
D3 Base frame scrapping & painting ,levelling NotStarted - - - - -
D4 Panel layout design & DAP approval for control panel NotStarted - - - - -
D5 Sub assembly completion NotStarted - - - - -
D6 Preparation of interlock matrix, address mapping IP list documentation NotStarted - - - - -
D7 Full assembly completion & alignment as per agreed document NotStarted - - - - -
D8 Alignment approval from design lead NotStarted - - - - -
D9 HMI Screen Developing NotStarted - - - - -
D10 Doweling for all assemblies NotStarted - - - - -
D11 Pneumatic piping +pheriperals assy NotStarted - - - - -
D12 Study Technical document, components drawings & RFQ NotStarted - - - - -
D13 Manual Operation Sequence NotStarted - - - - -
D14 Auto / Step Mode Operation Sequence NotStarted - - - - -
D15 Preparation of panel /field wiring NotStarted - - - - -

Task Description Status Planned Start Planned End Actual Start Actual End Remarks
E1 Electrical field wiring completion/power-on NotStarted - - - - -
E2 Check Short Circuit Test in the Panel (No Short Circuit) NotStarted - - - - -
E3 Checking Supply voltage between the Neutral to Earth (Less Than 1V) NotStarted - - - - -
E4 Checking Supply voltage between the Phase (R,Y,B - 415V) / (Phase to Neutral - 230V) NotStarted - - - - -
E5 PLC Inputs & Output and Manual Movement Testing NotStarted - - - - -
E6 Safety Device Testing (E-Stop & Door Switch) NotStarted - - - - -
E7 Step/Auto mode testing NotStarted - - - - -
E8 DAP document checking &sign off with CFT NotStarted - - - - -
E9 Safety check sheet completion & sign off with CFT NotStarted - - - - -
E10 Dry run of machine for > 12 hrs for heat ,noise etc NotStarted - - - - -
E11 Internal trails with min 3 hrs dry run
File required to complete
NotStarted - - - - -

Task Description Status Planned Start Planned End Actual Start Actual End Remarks
F1 Customer visit followup & equipment readiness as per agreed DAP NotStarted - - - - -
F2 Customer trails completion for agreed application NotStarted - - - - -
F3 Trail report preparation and signoff with CFT NotStarted - - - - -
F4 Preparartion of MOM and sign off with CFT NotStarted - - - - -
F5 Design error list preparation and submission to design lead NotStarted - - - - -
F6 RFQ for machine packing & transportation NotStarted - - - - -
F7 Machine load details sharing to transporter NotStarted - - - - -
F8 STO PO followup with customer /Invoice preparation NotStarted - - - - -
F9 MOM points closure and communication to customer NotStarted - - - - -
F10 Photos & Videos of equipment NotStarted - - - - -
F11 Manuals (Mechanical +Electrical ) printouts NotStarted - - - - -
F12 Machine packing NotStarted - - - - -
F13 Trials Parts STO closure or scrap clearence NotStarted - - - - -
F14 Insurance confirmation &Machine dispatch NotStarted - - - - -
F15 Communication to customer about machine dispatch NotStarted - - - - -
F16 Commissioning site readiness document preparation and submission to customer NotStarted - - - - -
F17 Machine installation & commissioning for agreed models NotStarted - - - - -
F18 Trails & observation points closure NotStarted - - - - -
F19 Training -Operators/Maintenance/TSG & handover NotStarted - - - - -
F20 MOM points closure and signoff NotStarted - - - - -

Bulk update via Excel: export the current checklist, edit Status/Start Date/End Date/Note, then upload it back here. Matched by Task Number, so reordering or renaming other columns is safe.
Standard BOM (Bill of Materials)

No Standard BOM uploaded yet for this project.

Timeline & Gantt Chart (Plan vs Actual)

A curated set of milestones, each covering a range of Process Flow Checklist tasks - each one shown as a weekly Plan row and Actual row, filled in for every calendar week its dates span. Nothing here is editable directly; update the checklist instead, or the milestone list itself under Master Data → Gantt Milestones.

Milestones are configured, but none of their tasks have Planned/Actual dates yet.